home hanwha flooring design flooring guide flooring preparation


    Flooring Preparation

1. Make sure that the floor is even and free of and concave or convex curves so that surface strength is good. Stones, concave or
    convex surface, dust, varnish, other foreign objects, materials, etc. degrades the adhesion of the product and results in poor
    product performance.


2. Ensure that there is no moisture or foreign substances on the floor. If found, remove completely. Less than 8% of moisture
    should be measured with the hygrometer.


3. Installation is ideal after 2 weeks from mortar construction in the summer and after 4 weeks from mortar construction  during
    rainy season.